Monday, July 9, 2012

Good Progress

Ran out of finish lumber so it's time to drive down out of the mountains to Las Cruces. At least 8 stops planned plus lunch, gas and grocery shopping. 50% chance of rain.

So the progress was in our bathroom and kitchen. Last October work on the shower floor haulted, 9 months later it's finished. Really looking forward to that first long hot shower!
Someday for a grand we will have a double glass door. For now it will be a curtain.

Now what did I do with the cover. 
Moving on to the kitchen, here is where I ran out of wood for the drawer fronts and sink cabinet doors. Hope to find this tomorrow. If not it's El Paso or Albuquerque.


You are looking at what is called a 4 drawer stack. 9 ply Birch plywood boxes with 12" full extension, soft closing, ball slides from www.DrawewrSlides.com

Yes that's tile and epoxy grout under the sink.

I will try not to forget the drawer pulls, on the shopping list for Home Depot tomorrow.

I'm about out of beer too!