Ran out of finish lumber so it's time to drive down out of the mountains to Las Cruces. At least 8 stops planned plus lunch, gas and grocery shopping. 50% chance of rain.
So the progress was in our bathroom and kitchen. Last October work on the shower floor haulted, 9 months later it's finished. Really looking forward to that first long hot shower!
|
Someday for a grand we will have a double glass door. For now it will be a curtain. |
|
Now what did I do with the cover. |
Moving on to the kitchen, here is where I ran out of wood for the drawer fronts and sink cabinet doors. Hope to find this tomorrow. If not it's El Paso or Albuquerque.
|
You are looking at what is called a 4 drawer stack. 9 ply Birch plywood boxes with 12" full extension, soft closing, ball slides from www.DrawewrSlides.com
Yes that's tile and epoxy grout under the sink. |
|
I will try not to forget the drawer pulls, on the shopping list for Home Depot tomorrow.
I'm about out of beer too! |
No comments:
Post a Comment